EMERGENCY NUMBER (24/7) +32 50 65 84 30 info@submar.be
Draining the Veurne lock

Draining the Veurne lock

The Corona pandemic did not make things easy for anyone. The draining of the Veurne lock was necessarily delayed due to safety regulations of our authorities. But finally the time had come.The upstream side of the lock had already been sealed off with wooden...
Wall thickness measurements in the Scheldt

Wall thickness measurements in the Scheldt

One of our customers is an important petrochemical company in the port of Antwerp. A large part of their supplies and deliveries goes via the Scheldt with ships. A large pipe bridge is connected to a loading and unloading jetty. To be sure of a flawless service, the...
Dampoortsluis

Dampoortsluis

The Dampoort lock in Bruges is a busy lock. The doors swing open almost continuously throughout the day. At night it gets quiet, still because of the lock. But a little further on there is a notorious pub. A large terrace, widespread tables and an enthusiastic crowd....
GREEN

GREEN

“Green needed us again” We are very proud to be their partners.
Assistance with dry-docking

Assistance with dry-docking

You can also count on Submar for assistance with dry-docking . Last weekend we were allowed to assist with the drydocking of this vessel in France.  Another satisfied customer!...

Core drillings

A major civil engineering company asked us to carry out deep core drillings through a lock floor.Measurements had shown that it was likely that there was a cavity under the lock floor.Several core drillings were carried out with a diameter of 150mm and 2 metres deep....